Working at Engenuity Solutions
My name is Rodrigo Goren, I am from Chile and 4 months ago I started working at Engenuity Solutions. In this post, I would like to share what my experience has been like working with the Engenuity team so…
My name is Rodrigo Goren, I am from Chile and 4 months ago I started working at Engenuity Solutions. In this post, I would like to share what my experience has been like working with the Engenuity team so…
Writing your undergraduate thesis can be the most rewarding and challenging year of your academic life. There will be many challenges along the way, but if you can persevere through…
Designed to maxmise the environmental and economic benefits of solar power at GemLife Highfields, Engenuity’s innovative solar solution is reducing power-grid energy consumption and power costs at the over-50s lifestyle…
Engenuity Solutions has been engaged to provide ongoing engineering services to support multinational gold producer OceanaGold at their Waihi mine site on the North Island of New Zealand. Securing the…
Engenuity Solutions, the engineering firm behind a major surf park development, has finalised an innovative world-first wave machine which is now ready for commercial production. The technology was commissioned by…
A Queensland engineering company has created a solution to proposed ‘switch-off’ measures for solar systems caused by the “perceived” increased instability of the national electricity grid. The Australian Energy Market…
ES carried out the asssessment and classification of spirals manufacturing facility in relation to explosive atmospheres resulting from spraying, casting and storage of hazardous substances. After classifying the facility we established a number of controls including design / implementation of gas monitoring system.
To address the requirement in AS3007 for mitigating Arc Flash hazards Engenuity Solutions conducted an Arc Flash Study of HV & LV boards at Cristal Mining’s Gingko mine. To effectively conduct the study we co-ordinated the development of a SKM PTW model which we used to conduct a Fault Study and Protection Coordination Study.
Engenuity Solutions inspected and reported on almost 200 substations across the BAC HV network. Our brief was to provide assessment of existing assets (in terms of condition, compliance and safety), recommend and prioritise immediate remedial actions, end of life cycle replacements and upgrades, as well as provide guidance on maintenance strategies, safety procedures and policies.
Engenuity Solutions have designed and certified solar installations for a range of commercial and industrial clients, including commissioning and testing the system where required. Recently we have just finished commissioning a 300kW system for Special Equipment in Brisbane.