Project Details
Client: | PPNQ Developments |
---|---|
Duration: | 1.5 Years |
Industries: |
|
Services: |
|
Situation: | PPNQ were developing a large holiday resort with attached waterpark in Cairns. The site network required significant energy and a HV connection, with a private reticulated HV system. PPNQ also wanted to consider the inclusion of a large solar system and potentially batteries. |
Our Role: | Engenuity was engaged to provide RPEQ services for electrical design across the development. The scope included private high voltage design and protection studies, Ergon power supply connection management, switchboard design and specification, and low voltage reticulation design. In addition, we worked with the client team to conduct a renewables study, followed by detailed solar and battery system design. |
The Outcome: | Bringing together the diverse skill set and knowledge of our engineering team, we were able to deliver detailed design of the essential back-bone electrical infrastructure for the whole Reefsedge development. This allowed PPNQ the electrical energy to execute their vision. The renewables study resulted in a design which is expected to provide considerable electricity savings to PPNQ while also reducing the development’s carbon footprint. |