Client: | EPC Solar / The NRMA |
---|---|
Duration: | 1 month per site |
Industries: |
|
Services: |
|
Context: | Electric Vehicle (EV) Fast Charge Stations are being installed at hundreds of locations across the country. To meet compliance obligations of the various Australian states, our client required designs produced by professional engineers. |
Our Role: | Engenuity was engaged by an Electrical Contractor to support them in the delivery of many EV fast charging station sites around Australia. Engenuity produced the electrical designs and drafting deliverables to enable installation of compliant EV fast charging stations in multiple states and a range of streetscapes. |
Key Outcomes: | Developed a range of template design arrangements for different site layouts and equipment selections to meet the end client’s requirements. These were then adjusted to meet the constraints of each individual site, optimising the design process, cost and schedule. |
Client: | Holcim Australia |
---|---|
Duration: | 4 years |
Industries: |
|
Services: |
|
Context: | Holcim Australia has mandated periodic external audits of electrical assets across a range of plants to verify electrical safety. |
Our Role: | Engenuity were appointed to assess hazards and verify safety management system compliance in electrical safety. Engenuity completed the audits across quarries, precast facilities, concrete & manufacturing plants and mobile batch plants. |
Key Outcomes: | Engenuity, in consultation with Holcim, has identified particular focus areas for improvement. Electrical audit reports were provided for each inspected plant, detailing the safety risks and equipment condition accompanied by corrective actions and timelines. |