Fremantle Port Authority were reviewing hazardous area compliance at one of their sites to ensure it is aligned with the latest Australian standards and site conditions.
Our Role:
Our role was to review the Kwinana Bulk Jetty hazardous area system including thehazardous area classification report and isolation procedures for the Manifold area, Berth 3 and Berth 4.
Key Outcomes:
The project provided the following benefits:
Guidance and recommendations on meeting requirements of the latest hazardous area standard series (AS 60079)
Reclassification and hazardous area calculations of the sites to latest standards.