Rio Tinto owns and operatesBell BayAluminiumin Tasmania. They are aiming to minimisealumina dust pollution caused by the unloading operation to increase operational safety and minimise environmental effects.
Our Role:
Engenuity was engaged in partnership with ASPEC to complete the pre-feasibility study,including electrical, instrumentation and control systems design foroptions to minimise dust pollution. This included modifications to both wharf infrastructure and process equipment.
Key Outcomes:
This project provided the following outcomes:
Preliminary design for three (3) options to minimise dust pollution.